05/2021
- Production Certificate
- Greece
for CANTREVA green field project development
of 2.500 MWp PV plants
03/2021
- COD - Wind
- Azov - Russia
for the EPC of 90 MWp (Wind farms incl.
Substation and 50km Overhead HV Transmission Lines)
12/2020
- Envelope Submission
- Greece
for CANTREVA green field project development
of 2.000 MWp PV plants
12/2019
- Envelope Submission
- Greece
for CANTREVA green field project development
of 800 MWp PV plants
09/2019
- Envelope Submission
- Greece
for CANTREVA green field project development
of 400 MWp PV plants
09/2019
- Invitation to RfQ
- Poland
by multinational utility for the EPC of Wind plants
09/2019
- Invitation to RfQ
- Italy
by multinational utility for the EPC of Wind plants
09/2019
- COD
- Greece
Commercial Operation Date for Kafireas Wind Farm
complex 160 MW (2 Wind Farms incl. Substations and Submarine landing
points)
07/2019
- Preferred Bidder - Russia
by multinational
utility for the EPC of aprox. 200 MWp (2 Wind farms incl.
Substations and Overhead HV Transmission Lines)
07/2019
- COW - Wind
- Murmansk - Russia
for the EPC of 200 MWp (Wind farms incl.
Substation and 70km Overhead HV Transmission Lines)
05/2019
- Invitation to RfQ - Russia
by multinational
utility for the EPC of aprox. 200 MWp (2 Wind farms incl.
Substations and Overhead HV Transmission Lines)
0/20199
- COW
- Azov - Russia
for the EPC of 200 MWp (Wind farms incl.
Substation and 50km Overhead HV Transmission Lines)